Some Achievements
CEB Kits – Mauritius
- Scope: EPC for installations of 1149 PV Grid tied Kits (2MWp)
- Installation Time: 7 months
Djema 1 – Mayotte
- Installed Capcity: 0.9 MW + 1 MWp Energy Storage
- Annual Energy production: 1440 MWp
- Construction Time: 7 months
SPV Petite Rivière – Mauritius
- Installed Capcity: 5 MWp
- Annual Energy production: 8250 MWp
- Construction Time: 8 Months
Dzoumogne – Mayotte
- Installed Capacity: 1.8 MWp & 2MWp Energy Storage
- Construction Time: 8 months
Henrietta – Mauritius
- Annual Energy production: 3 000 MWp
- Construction Time: 8 months
Montvendre – France
- Installed Capcity: 2 607 kWp
- Annual Energy production: 3 310 MWp
- Construction Time: 8 Months
12 CWA sites
- Installed Capacity: 250 kWp
- Construction Time: 8 Months
CEB 1MW Grenade Rodrigues
- Installed Capacity: 1MW
- Construction Time: 8 Months
Mairie de Bandrélé
- CAPACITY: 39.6kWp
- SCOPE: EPC pour la Mairie de Bandrélé, autoconsommation
- STATUS: Complete on Jan 2024
Rectorat de Mayotte
- CAPACITY: 112kWp
- SCOPE: EPC pour le rectorat de Mayotte
- STATUS: Complete on May 2024
3000 X 2.0 kWac GRID-TIE ROOF-
MOUNTED SOLAR PHOTOVOLTAIC KITS
(Mauritius )
- SCOPE : EPC for CEB
- STATUS: Completed
Plaines des Roches PV Farm
- CAPACITY: 10MW
- LOCATION: Plaine Des Roches
- SCOPE: IPP
- COMPLETED
Centrale solaire de Dzoumogné - Mayotte
Corexsolar Petite Riviere Photovoltaic Farm _ TimeLapse
Corexsolar International unveils the Henrietta PV Farm
FILM COREXSOLAR
Plaines des Roches PV Farm