Some Achievements

CEB Kits – Mauritius
- Scope: EPC for installations of 1149 PV Grid tied Kits (2MWp)
- Installation Time: 7 months

Djema 1 – Mayotte
- Installed Capcity: 0.9 MW + 1 MWp Energy Storage
- Annual Energy production: 1440 MWp
- Construction Time: 7 months

SPV Petite Rivière – Mauritius
- Installed Capcity: 5 MWp
- Annual Energy production: 8250 MWp
- Construction Time: 8 Months

Dzoumogne – Mayotte
- Installed Capacity: 1.8 MWp & 2MWp Energy Storage
- Construction Time: 8 months

Henrietta – Mauritius
- Annual Energy production: 3 000 MWp
- Construction Time: 8 months

Montvendre – France
- Installed Capcity: 2 607 kWp
- Annual Energy production: 3 310 MWp
- Construction Time: 8 Months

12 CWA sites
- Installed Capacity: 250 kWp
- Construction Time: 8 Months

CEB 1MW Grenade Rodrigues
- Installed Capacity: 1MW
- Construction Time: 8 Months